← Volver a la portada
Asia · Actualidad general · CNA

Tanjong Pagar Road to undergo works to remove roadside parking lots, add new cycling paths

Publicado por CNA · Singapur hace 1 d
The Land Transport Authority (LTA) notice detailing the upcoming works along Tanjong Pagar Road. (Photo: Izarul Adam)
The Land Transport Authority (LTA) notice detailing the upcoming works along Tanjong Pagar Road. (Photo: Izarul Adam) · CNA

Resumen detallado

The construction is expected to last from November 2026 to December 2027, according to a notice put up by the Land Transport Authority (LTA) in the area.

The construction is expected to last from November 2026 to December 2027, according to a notice put up by the Land Transport Authority (LTA) in the area.

SINGAPORE: Tanjong Pagar Road will undergo construction works from November 2026 to December 2027 to add new cycling paths and a high covered linkway.

According to a notice put up by the Land Transport Authority (LTA) in the area, a new cycling path and footpath will be added between Craig Road and Duxton Hill.

The roadside parking lots between Cook Street and Craig Road, located on the same stretch, will be removed.

A new cycling path between Duxton Hill and Maxwell Road, and a new cycling path and footpath near Tanjong Pagar Plaza Market and Food Centre will also be constructed. The existing drainage systems at these sections will also be upgraded, the notice said.

A short stretch of Duxton Hill between Duxton Road and Tanjong Pagar Road will be converted from two-way to one-way traffic, with vehicles exiting on Tanjong Pagar Road, the notice said.

"Reclaimed road spaces will enhance pedestrian and cycling connectivity along Tanjong Pagar Road," it said.

A new high covered linkway across Tanjong Pagar Road will be constructed. The diagram in LTA's notice indicated it would be near Tras Link and Tanjong Pagar Plaza Market and Food Centre.

The bus stop before Craig Road, or BS05429, will be relocated and upgraded with bus-friendly humps near Orchid Hotel, it said.

Inicio del artículo, extracto de CNA. Para leer el resto, abra el artículo en el sitio del medio.

Leer el artículo completo en CNA Inicie sesión para guardar

MarketNews muestra el titular y el resumen publicados por el medio. El artículo completo se lee en el sitio del editor. (www.channelnewsasia.com)

También te puede interesar