Union Power Metals Confirms Historical Manganese Mineralization in First Modern Drill Holes at Michalová, Slovakia

Résumé détaillé
Union Power Metals Corporation (CSE: UPPR) (OTCQB: UPERF) (FSE: UPR) (“Union Power” or the “Company”) is pleased to report that the first modern drill holes at its Michalová manganese project in central Slovakia have confirmed the manganese mineralization recorded by historical drilling in the 1950s.
This press release is provided by GlobeNewswire and is published as received.
VANCOUVER, British Columbia, Nov. 17, 2026 (GLOBE NEWSWIRE) -- Union Power Metals Corporation (CSE: UPPR) (OTCQB: UPERF) (FSE: UPR) (“Union Power” or the “Company”) is pleased to report that the first modern drill holes at its Michalová manganese project in central Slovakia have confirmed the manganese mineralization recorded by historical drilling in the 1950s. Twin holes V-13 and V-11 both intersected near-surface manganese oxide mineralization at the depths and at thicknesses comparable to those recorded in the historical logs.
Program ObjectivesThe Michalová drill program has two objectives. The first is to verify the historical exploration data by drilling twin holes at or adjacent to selected 1950s drill holes and comparing the depth, thickness and character of the mineralization, and, once laboratory assays are received, the grade, with the historical records. The second is to obtain fresh, representative material from the oxide and carbonate mineralization for metallurgical testwork designed to evaluate Michalová’s potential to produce high-purity, battery-grade manganese products.
The results reported here address the first objective. The comparison with historical drilling at this stage is a comparison of the depth, thickness and character of the mineralized horizon as logged in the core; the comparison of grades will follow once laboratory assays are received. Core from the completed holes has been sampled and delivered to ALS, representative composites for metallurgical testwork are being assembled, and drilling of the remaining holes of the 25-hole program is planned to continue.
Hole V-13 (twin of historical hole M-96)V-13 was collared at the recorded location of historical hole M-96, as digitised from the 1950s archival plans, and drilled vertically to a depth of 25.9 metres.
Two layers of manganese mineralization were logged. The upper layer, from 6.5 to 7.4 metres, consists of…
Début de l'article, extrait de BNN Bloomberg. Pour lire la suite, ouvrez l'article chez le média.
MarketNews présente le titre et le résumé publiés par le média. L'article complet se lit sur le site de l'éditeur. (www.bnnbloomberg.ca)



